China Shipbuilding
  | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
Shipping
 新造船 | 散货船 |  集装箱船 | 油轮及化学品船 | LNG/LPG 运输船 | 特种船及其他船型
 
 
 
 

1,400 TEU Container Feeder, LNG Fueled, Developed by Huangpu-Wenchong Shipyard

MAIN PARTICULARS

Length (o.a.) : 169.95 m
Length (b.p.) :  160.96 m
Bread moulded:   26.90 m
Depth moulded:   14.85 m
Design draught (Td): 8.50 m
Scantling draught (Ts):      9.60 m
Deadweight @ Ts:        19,500 ton

CONTAINER CAPACITY

On deck (6 tiers) :  844 TEU
In hold (5 tiers) :            536 TEU
Total: 1,380 TEU

MAIN ENGINE & SPEED

Main Engine: WIN GD 7RT-FLEX50DF T-III
Service Speed: 18.5 kn
Fuel Comsumption (Gas Model): 7,153 KJ/kWh

LNG FUELED

LNG Tank (Type C): 690 m3             
Endurance (LNG): 3200 nm
Endurance (HFO/MGO)  6500 nm

1,868 TEU Container Feeder, Bangkok type

  • Bangkok type
  • Hull form features S-BOW, optimized base on operation profile
  • Cargo holds for 3 tiers of 9’6” high cube + 2 tiers of 8’6”
  • Containerized dangerous goods of IMDG
  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : 171.95 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.30 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 9.50 m
Deadweight @ Ts:  23,750 ton

 

CONTAINER CAPACITY

In Hold / On Deck
626 / 1,286 TEU
Total
1,868 TEU
 Homogeneous 14t/TEU (T=9.75m) 1,290 TEU
Reefer plugs in hold / on deck: 50 / 180 FEU
Reefer (total): 230 FEU

MAIN ENGINE & SPEED

Main Engine: WinGD 6RT-flex58T-E Tier II, 1 set
Service Speed: 18.5 kn
Fuel Comsumption:     40.2 t/d

 EEDI Phase-III


1900 TEU Container Feeder, Gearless, Developed by Huangpu-Wenchong Shipyard

  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : abt. 172.00 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.60 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 10.00 m
Deadweight @ Ts:  24400 ton

CLASS NOTATION

- DNVGL +1A Container Ship, COAT-PSPC(B), LCS, BIS, E0,BWM(T), Recyclable, Clean,TMON(oil lubricated), DG(P),

CONTAINER CAPACITY

On deck (7 tiers) 1,286 TEU
In hold (5 tiers)  644 TEU
Total   1,930 TEU
   
Reefer (on deck): 200 FEU
Reefer (in hold): 20 FEU
Reefer (total): 220 FEU

MAIN ENGINE & SPEED

Main Engine: MAN B&W 6S60ME-C10.5
Service Speed: 18.5 kn
Fuel Comsumption:     35.62 t/d

Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
51Hangtong HTJ23225Container Ship, 120 teuChina Communications Construction (中国交通建设)Jiangmen Hangtong Shipbuilding2025 - 102023 - 09
52Hangtong HTJ23228Container Ship, 216 teuChina Communications Construction (中国交通建设)Jiangmen Hangtong Shipbuilding2026 - 012023 - 09
53Hangtong HTJ23223Container Ship, 120 teuChina Communications Construction (中国交通建设)Jiangmen Hangtong Shipbuilding2025 - 062023 - 09
54Jianxing JX1000TEU-8Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2026 - 052023 - 07
55Jianxing JX1000TEU-7Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2026 - 032023 - 07
56Jianxing JX1000TEU-6Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2026 - 012023 - 07
57Jianxing JX1000TEU-4Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2025 - 092023 - 07
58Jianxing JX1000TEU-2Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2025 - 052023 - 07
59Jianxing JX1000TEU-1Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2025 - 032023 - 07
60NordatlanticContainer Ship, 1,911 teuReederei Nord GmbHHuangpu-Wenchong Shipbuilding2025 - 032023 - 07
61Huangpu Wenchong H2503Container Ship, 1,911 teuReederei Nord GmbHHuangpu-Wenchong Shipbuilding2025 - 082023 - 07
62Huangpu Wenchong H2502Container Ship, 1,911 teuReederei Nord GmbHHuangpu-Wenchong Shipbuilding2025 - 052023 - 07
63Xinle XL-206Container Ship, 701 teuSamudera IndonesiaXinle Shipyard2024 - 112023 - 06
64A2B VisionContainer Ship, 650 teuA2B-Online LtdSedef Gemi Insaati2025 - 022023 - 06
65Seatrade PanamaContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 072023 - 06
66Seatrade CuracaoContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 082023 - 06
67Huangpu-Wenchong H2508Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2025 - 082023 - 06
68Huangpu-Wenchong H2509Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2025 - 102023 - 06
69Huangpu Wenchong H2510Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2025 - 112023 - 06
70Huangpu-Wenchong H2511Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2026 - 012023 - 06
71Huangpu-Wenchong H2512Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2026 - 032023 - 06
72Huangpu-Wenchong H2513Container Ship, 1,250 teuSea ConsortiumHuangpu-Wenchong Shipbuilding2026 - 052023 - 06
73A2B ProgressContainer Ship, 650 teuA2B-Online LtdSedef Gemi Insaati2025 - 052023 - 06
74Zhenjiang VZJ450-2303Container Ship, 428 teuUnknownJiangsu Zhenjiang Shipyard2026 - 012023 - 06
75Zhenjiang VZJ450-2302Container Ship, 428 teuUnknownJiangsu Zhenjiang Shipyard2025 - 082023 - 06
Records: 135,   Page: 1  2  3  4  5  6  



如果您有意建造新船,请留言并留下您的联系方式:
 
China Shipbuilding, 2014