China Shipbuilding
  | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
 新造船 | 散货船 | 集装箱船 | 油轮及化学品船 |  LNG/LPG 运输船 | 特种船及其他船型
 
 
 
 

93,000 m³ VLGC, LPG-Fuelled -- Developed by Jiangnan Shipyard

  • The Vessel to be constructed for the transportation of liquefied gases such as propane, butane, mixture of propane and butane. 
  • The Vessel to have a upper deck with aft sunken deck, VS-Bow (Patented), transom stern with open water type stern frame, semi-balanced rudder and a fixed pitch propeller directly driven by a slow speed LPG dual fuel diesel engine.
  • The low speed diesel engine shall be capable of burning LSDO/HFO and LPG (propane, butane and their mixture).
  • The propulsion machinery and living quarters including navigation bridge to be located in after.
  • The Vessel to be built to have four (4) independent self-supporting prismatic cargo tanks which to be designed for a maximum pressure of 0.25 bar g, a minimum temperature of -50ºC and a maximum cargo specific gravity of 0.60. 
  • Double bottom tanks with hopper and top side tanks to be arranged for water ballast. Pipe duct to be arranged in the center part of double bottom in way of cargo area.

MAIN PARTICULAR

Length (o.a.) 230.00 m
Breadth, mld 36.60 m
Depth, mld 22.50 m
Design Draft (Td)  11.60 m 
Scan Drafttl. (Ts) 12.20 m

TANK CAPACITY 

Cargo Tank 93,000 m³
Ballast Water 23,000 m³
Heavy fuel oil 2,000 m³
Diesel oil 300 m³
Fresh water 300 m³

MAIN ENGINE & SPEED 

Main Engine: 6G60ME-C-10.5 (LGIP) 
Fuel Gas Consumption: 36.8 t/d
Service Speed: 16.8 kn
Cruising Range: 22,000 nm

POWER SUPPLY 

Diesel Generators 1,250 kW x 2 set + 950kW x 1 set
Emergency Generator 250 kW x 1 set
Shaft Generator (Option)  2,000 kW x 1 set

Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
1Yangzi-MitsuiLPG Tanker, 88,000 cbmNissen Kaiun KKYangzi-Mitsui Shipbuilding2029 - 012024 - 07
2Yangzi-MitsuiLPG Tanker, 88,000 cbmNissen Kaiun KKYangzi-Mitsui Shipbuilding2028 - 092024 - 07
3Yangzi-MitsuiLPG Tanker, 88,000 cbmNissen Kaiun KKYangzi-Mitsui Shipbuilding2028 - 052024 - 07
4Yangzi-MitsuiLPG Tanker, 88,000 cbmNissen Kaiun KKYangzi-Mitsui Shipbuilding2028 - 012024 - 07
5Hyundai Ulsan 3532LPG Tanker, 86,240 cbmBGN International DMCCHyundai HI, Ulsan2027 - 062024 - 07
6Hyundai Ulsan 3531LPG Tanker, 86,240 cbmBGN International DMCCHyundai HI, Ulsan2027 - 032024 - 07
7Hyundai SamhoLPG Tanker, 93,000 cbmMaersk Tankers A/SHyundai HI, Samho2028 - 112024 - 07
8Hyundai SamhoLPG Tanker, 93,000 cbmMaersk Tankers A/SHyundai HI, Samho2028 - 092024 - 07
9JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2028 - 022024 - 07
10JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2027 - 122024 - 07
11JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2027 - 102024 - 07
12JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2027 - 072024 - 07
13JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2027 - 052024 - 07
14JiangnanLPG Tanker, 150,000 cbmEastern Pacific ShippingJiangnan Shipyard2027 - 022024 - 07
15JiangnanLPG Tanker, 97,020 cbmWanhua Chemical (万华化学)Jiangnan Shipyard2027 - 102024 - 07
16JiangnanLPG Tanker, 97,020 cbmWanhua Chemical (万华化学)Jiangnan Shipyard2027 - 052024 - 07
17JiangnanLPG Tanker, 97,020 cbmWanhua Chemical (万华化学)Jiangnan Shipyard2027 - 012024 - 07
18JiangnanLPG Tanker, 97,020 cbmWanhua Chemical (万华化学)Jiangnan Shipyard2026 - 052024 - 07
19JiangnanLPG Tanker, 97,020 cbmWanhua Chemical (万华化学)Jiangnan Shipyard2026 - 102024 - 07
20Kyokuyo 585LPG Tanker, 10,800 cbmUnknownKyokuyo Shipyard, Shimonoseki2026 - 062024 - 06
21Kyokuyo 583LPG Tanker, 10,800 cbmUnknownKyokuyo Shipyard, Shimonoseki2026 - 032024 - 06
22SOE S1114LPG Tanker, 39,200 cbmUnknownCIMC Sinopacific (SOE)2028 - 042024 - 06
23SOE S1113LPG Tanker, 39,200 cbmUnknownCIMC Sinopacific (SOE)2027 - 122024 - 06
24Kawasaki Sakaide 1770LPG Tanker, 86,000 cbmKumiai Senpaku Co., Ltd.Kawasaki HI, Sakaide2026 - 042024 - 06
25JiangnanLPG Tanker, 91,140 cbmADNOC Logistics & ServicesJiangnan Shipyard2026 - 112024 - 05
Records: 251,   Page: 1  2  3  4  5  6  7  8  9  10  >>



如果您有意建造新船,请留言并留下您的联系方式:
 
China Shipbuilding, 2014