China Shipbuilding
  | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
Shipping
 新造船 | 散货船 |  集装箱船 | 油轮及化学品船 | LNG/LPG 运输船 | 特种船及其他船型
 
 
 
 

1,400 TEU Container Feeder, LNG Fueled, Developed by Huangpu-Wenchong Shipyard

MAIN PARTICULARS

Length (o.a.) : 169.95 m
Length (b.p.) :  160.96 m
Bread moulded:   26.90 m
Depth moulded:   14.85 m
Design draught (Td): 8.50 m
Scantling draught (Ts):      9.60 m
Deadweight @ Ts:        19,500 ton

CONTAINER CAPACITY

On deck (6 tiers) :  844 TEU
In hold (5 tiers) :            536 TEU
Total: 1,380 TEU

MAIN ENGINE & SPEED

Main Engine: WIN GD 7RT-FLEX50DF T-III
Service Speed: 18.5 kn
Fuel Comsumption (Gas Model): 7,153 KJ/kWh

LNG FUELED

LNG Tank (Type C): 690 m3             
Endurance (LNG): 3200 nm
Endurance (HFO/MGO)  6500 nm

1,868 TEU Container Feeder, Bangkok type

  • Bangkok type
  • Hull form features S-BOW, optimized base on operation profile
  • Cargo holds for 3 tiers of 9’6” high cube + 2 tiers of 8’6”
  • Containerized dangerous goods of IMDG
  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : 171.95 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.30 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 9.50 m
Deadweight @ Ts:  23,750 ton

 

CONTAINER CAPACITY

In Hold / On Deck
626 / 1,286 TEU
Total
1,868 TEU
 Homogeneous 14t/TEU (T=9.75m) 1,290 TEU
Reefer plugs in hold / on deck: 50 / 180 FEU
Reefer (total): 230 FEU

MAIN ENGINE & SPEED

Main Engine: WinGD 6RT-flex58T-E Tier II, 1 set
Service Speed: 18.5 kn
Fuel Comsumption:     40.2 t/d

 EEDI Phase-III


1900 TEU Container Feeder, Gearless, Developed by Huangpu-Wenchong Shipyard

  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : abt. 172.00 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.60 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 10.00 m
Deadweight @ Ts:  24400 ton

CLASS NOTATION

- DNVGL +1A Container Ship, COAT-PSPC(B), LCS, BIS, E0,BWM(T), Recyclable, Clean,TMON(oil lubricated), DG(P),

CONTAINER CAPACITY

On deck (7 tiers) 1,286 TEU
In hold (5 tiers)  644 TEU
Total   1,930 TEU
   
Reefer (on deck): 200 FEU
Reefer (in hold): 20 FEU
Reefer (total): 220 FEU

MAIN ENGINE & SPEED

Main Engine: MAN B&W 6S60ME-C10.5
Service Speed: 18.5 kn
Fuel Comsumption:     35.62 t/d

Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
1HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 102025 - 01
2HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 122025 - 01
3Dajin DJHC6092Container Ship, 1,208 teuUnknownJiangsu Dajin HI2026 - 122025 - 01
4Seatrade FranceContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2027 - 072025 - 01
5Seatrade SpainContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2027 - 092025 - 01
6Dajin DJHC6094Container Ship, 1,208 teuUnknownJiangsu Dajin HI2027 - 062025 - 01
7Dajin DJHC6096Container Ship, 1,208 teuUnknownJiangsu Dajin HI2027 - 102025 - 01
8Dajin DJHC6101Container Ship, 1,208 teuUnknownJiangsu Dajin HI2028 - 012025 - 01
9Jianxing JX1000TEU-5Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2025 - 112024 - 11
10HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 082024 - 10
11HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 072024 - 10
12Seatrade NederlandContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 102024 - 10
13Seatrade BelgieContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 102024 - 10
14Hyundai Mipo 4283Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 072024 - 09
15Hyundai Mipo 4284Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 082024 - 09
16Hyundai Mipo 4280Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 022024 - 09
17Hyundai Mipo 4279Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 012024 - 09
18Hyundai Mipo 4282Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 052024 - 09
19Hyundai Mipo 4281Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 042024 - 09
20Sanfu SF240311Container Ship, 500 teuUnknownTaizhou Sanfu Shipyard2026 - 072024 - 09
21Sanfu SF240311Container Ship, 500 teuUnknownTaizhou Sanfu Shipyard2026 - 092024 - 09
22Shengchang 12Container ShipWenzhou Shengchang Shipping CoChizhou Tianyu Shipbuilding2025 - 062024 - 09
23Shengchang 15Container ShipWenzhou Shengchang Shipping CoChizhou Tianyu Shipbuilding2025 - 062024 - 09
24Kyokuyo 589Container Ship, 1,096 teuUnknownKyokuyo Shipyard2026 - 082024 - 09
25Miura 1700Container Ship, 400 teuHamano Kaiun KKMiura Zosensho, Saiki2025 - 102024 - 07
Records: 133,   Page: 1  2  3  4  5  6  



如果您有意建造新船,请留言并留下您的联系方式:
 
China Shipbuilding, 2014