China Shipbuilding
  |    | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
 
1200T Self-elevating and Self-propelled Offshore wind turbine Service Unit
1200T Self-elevating and Self-propelled Offshore wind turbine Service Unit

The unit to be a Turbine Installation Unit, capable of transporting offshore 8MW wind turbines to the wind farm site from ashore, transitioning from the afloat condition to an elevated construction mode, and install the 8M...
Drill Ship - Tiger
This drill ship is a full turnkey vessel by carrying out engineering, procurement and construction of each complete vessel. These projects are the first EPC drill ship contracts to be undertaken in China with full intellectual property right in China. These contracts represent the successful phase o...
Newcastle Bulk Carrier
The Vessel to be a single screw ocean going Bulk Carrier having a deadweight of about 210,000 metric tons and to have topside tank, hopper and single side skin in way of cargo space, with forecastle, a stem, a transom stern and open water type of stern frame, a semi-balanced rudder and a fixed pitch...
MR Chemical/Product Oil Tanker
The vessel is to be designed for service worldwide trading (incl. Suez and Panama Canal), transporting all types of oil products listed in MARPOL 73/78 Annex I appendix except asphalt solutions, and transporting chemicals IMO II/III (non-toxic listed in Chapter 17 of IBC code), according to Class no...
Chemical Tanker
The vessel is a single screw motor driven product oil/chemical tanker with machinery and accommodation located aft, having forecastle and five tiers of deck house. Six (6) pairs of double side skin cargo tanks including one (1) pair of slop tanks with Marineline coating are arranged, with fourteen (...
Aframax Crude/Product Oil Tanker (LR2)
The vessel is to be designed for service worldwide trading (incl. Suez Canal), transporting crude oil excluding asphalt solutions. The vessel is to be a single screw diesel engine driven with a semi-balanced type rudder. The vessel has one (1) complete upper deck, stem without bulbous bow, transom s...
Jiangsu Zhenjiang Shipyard
Jiangsu Zhenjiang Shipyard (Group) Co.,Ltd.,founded in 1951. The yard total area of approx 500k m2, one 50,000DWT, one 20,000DWT and 5,000DWT shipbuilding slipway, 1,200m fixed quay.

The yard is fo...
Aza Shipping
Aza Shipping Pvt Ltd
2B, Industry Manor, Appasaheb Marathe Marg
Mumbai, India
Tel: +91 222 422 0400
Fax: +91 222 422 0401
Email: aza@azashipping.com
Kassian Maritime Navigation Ltd.
3rd Floor, Megaro Makedonia, 367. Sygrou Avenue
175 64 Athens, Greece
Tel: +30 2109402001
Fax: +30 210 9480674
Email: office@kassian.gr

希腊散货船东。Kassian Pappadakis的家族企业,Pappadakis家族从事航运业务始于18世纪,是...
MOL orders four LNG carriers for Qatar Energy at Hudong-Zhonghua (2022-04-13)
CSSC Hudong-Zhonghua Shipbuilding and MOL have entered into the shipbuilding contract for the construction of four new LNG carriers serve for Qatar Energy’s LNG growth projects and future fleet requir...
Seaspan confirms order of ten 7,000TEU boxships at SWS (2021-10-07)
The Canadian vessel owner and operator, Seaspan Corporation has entered into an agreement with shanghai waigaoqiao shipyard (SWS) for ten 7,000TEU scrubber-fitted new container ships.

The newbuild ...
英国上诉法院最新案例:如何区分一般保函和见索即付保函? (2021-08-30)
在造船合同中,造船方根据合同造出符合约定的船只,而购船方则需要在不同的阶段按合同规定支付一定的造船款。与此同时,银行或其它机构也有可能为购船方提供保函而作为造船合同下付款的保证。保函的提供可以给造船方一定的收款保障,如果购船方不支付造船款,造船方可以依据保函向担保人索要其在造船合同下应得的付款。

根据保函的不同类型,造船方对担保方提出付款要求的条件和时间点会有不同。英国上诉法院(Court ...
Fratelli Cosulich Orders LNG Bunkering Vessel at CIMC SOE (2021-05-11)
Italian firm Fratelli Cosulich Group has ordered a liquefied natural gas (LNG) bunkering vessel. The ship, which will be built in China, at the CIMC SOE shipyard, with its approximately 5,300 tons of ...
MSC placed an order at CSSC for thirteen 16,000 teu container vessels (2021-05-11)
Mediterranean Shipping Co (MSC) placed an order at China State Shipbuilding Corporation (CSSC) for thirteen 16,000 teu container vessels, valued in excess of Y10bn ($1.52bn).

MSC signed up for 13 ...
NYK Line orders Four LNG-fuelled PCTCs at Jinling Shipyard (2021-01-15)
NYK has concluded a shipbuilding contract with China Merchants Jinling Shipyard (Nanjing) Co. Ltd. for four LNG-fueled PCTCs. These four vessels will be delivered from 2022 to 2023 and are planned to ...
GSI delivered the 2nd MR tanker of series 8 to IMC Group (2020-10-02)
CSSC Guangzhou Shipyard Internal (GSI) delivered a 50,000 dwt IMO Type II MR Chemical Tanker to Aurora Tankers, a wholly owned subsidiary of IMC Industrial Group (IMC). The vessel is the second unit o...
Dalian Shipyard delivery the 2nd VLEC to JACCAR (2020-07-29)
On July 28, the second 85,000 cbm VLEC built by Dalian Heavy-Industry Group (Dalian HI), CSSC for France's JACCAR Holdings Group, was delivered to the ship owner.

With length of 231.6 meters, Beam ...
2019年液化石油气(LPG)运输船市场评述 (2020-04-04)
船队规模

lower-than average fleet growth helped to tighten tonnage and support rates
低于平均水平的船队增长有助于运力收缩和运费上涨


Last year, 18 new units hit the water and for the first time since 2015, no VLGC was ...
提纲挈领读懂造船合同--造船合同第11章,买方违约 (2019-08-30)
(1)买方未支付节点款;
(2)买方未支付交船款并按时接船;

出现买方违约的情况下,卖方有权:
(1)宣布买方违约并保留合同项下的权利;
(2)根据卖方的意愿延长交船期,如有规则规范的调整,由买方承担;
(3)在买方XX天时间内仍未弥补上述违约,卖方有权要求滞留已付款项;以及
(4)卖方有权要求加速支付所有未付款项,并要求付款保函项(如有)下的权利;以及
(5)卖方可以选择继续造...
提纲挈领读懂造船合同--造船合同第18章,合同生效 (2019-08-27)
标准造船合同是签字生效。

This Contract shall become effective upon being signed by both parties.

实际操作过程中合同生效有各自条件,如XX天内开具还款保函,XX天买方支付第一期款,XX天内双方董事会通过,等

This Contract shall become effective (“Effective Da...
Records: 120,   Page: 1  2  3  4  5  6  

China Shipbuilding, 2014