 |
|
|
|
|
|
|
|
|
|
158,000DWT (Suezmax) Crude Oil Tanker -- Designed by Shanghai Waigaoqiao Shipbuilding (SWS)
With Tire III and comfort I applied.
The Vessel shall be an ocean going crude oil tanker suitable for carrying crude oil having flash points at or below 60°C (Closed Cup Test) and driven by a slow speed marine diesel engine. The Vessel shall have a fully welded continuous upper deck, a raked stem with bulbous bow, a transom stern with stern frame, a semi-balanced rudder and fixed pitch propeller.
MAIN PARTICILAR
- Length (o.a.): 274.30m
- Length (b.p.): 267.00m
- Breadth: 48.00m
- Depth: 23.40m
- Designed draft: 16.00m
- Scantl. draft: 17.20m
- Deadweight: 158,000 ton (@Scantl. draft)
- Complement: 28 + 6 Suez crews
CRUISING RANGE: 24,000 nautical miles
SERVICE SPEED: 14.8kn
CAPACITIES
- Cargo tanks including slop tanks: 175,000 m³
- Heavy fuel oil tanks: 3,600 m³
- Marin gas oil including service tank: 400 m³
- Fresh water tank including distilled water tank: 500 m³
- Water ballast tanks including peak tanks: 53,000 m³
MAIN ENGINE
- Model: MAN B&W 6G70ME-C9.5 Tier III
- MCR: 21,840 kW x 83.0 RPM
- SMCR: 16,513 kW x 74.5 RPM
- NCR: 12,220 kW x 67.4 RPM
FUEL OIL CONSUMPTION
- 46.16 ton/day (Tire II mode)
- 47.6 ton/day (Tire III mode) |
新造船订单
Vessel Type | Shipyard | Owner Company | Delivery | Contract Date |
Tanker, 159,000 DWT | JMU Ariake Shipyard | Kyklades Maritime Corporation | 2026 - 09 | 2023 - 08 |
Tanker, 159,000 DWT | JMU Ariake Shipyard | Kyklades Maritime Corporation | 2026 - 07 | 2023 - 08 |
Tanker, 50,000 DWT | Jiangsu New YZJ | Tsakos Energy Navigation | 2026 - 03 | 2023 - 08 |
Tanker, 50,000 DWT | Jiangsu New YZJ | Tsakos Energy Navigation | 2025 - 12 | 2023 - 08 |
Tanker, 157,000 DWT | Nihon Shipyard | Advantage Tankers | 2025 - 12 | 2023 - 07 |
Tanker, 157,000 DWT | Nihon Shipyard | Advantage Tankers | 2025 - 09 | 2023 - 07 |
Tanker, 158,000 DWT | DH Shipbuilding | Atlas Maritime LTD | 2025 - 10 | 2023 - 07 |
Tanker, 158,000 DWT | DH Shipbuilding | Atlas Maritime LTD | 2026 - 02 | 2023 - 07 |
Tanker, 158,000 DWT | DH Shipbuilding | Advantage Tankers | 2025 - 09 | 2023 - 07 |
Tanker, 155,000 DWT | New Times Shipbuilding | Maran Tankers Management Inc. | 2027 - 05 | 2023 - 07 |
Tanker, 155,000 DWT | New Times Shipbuilding | Maran Tankers Management Inc. | 2027 - 01 | 2023 - 07 |
Tanker, 155,000 DWT | New Times Shipbuilding | Maran Tankers Management Inc. | 2027 - 03 | 2023 - 07 |
Tanker, 155,000 DWT | New Times Shipbuilding | Maran Tankers Management Inc. | 2027 - 02 | 2023 - 07 |
Tanker, 158,000 DWT | Samsung HI | Unknown | 2026 - 02 | 2023 - 06 |
Tanker, 158,000 DWT | Samsung HI | Unknown | 2025 - 11 | 2023 - 06 |
Tanker, 157,000 DWT | New Times Shipbuilding | Polembros Shipping Limited | 2025 - 05 | 2023 - 06 |
Tanker, 157,000 DWT | New Times Shipbuilding | Polembros Shipping Limited | 2025 - 04 | 2023 - 06 |
Tanker, 157,000 DWT | New Times Shipbuilding | Eastern Pacific Shipping Pte. Ltd. | 2025 - 12 | 2023 - 05 |
Tanker, 157,000 DWT | New Times Shipbuilding | Eastern Pacific Shipping Pte. Ltd. | 2026 - 07 | 2023 - 05 |
Tanker, 157,000 DWT | DH Shipbuilding | Euronav NV -- CMB Group | 2025 | 2023 - 04 |
Tanker, 157,000 DWT | DH Shipbuilding | Euronav NV -- CMB Group | 2025 | 2023 - 04 |
Tanker, 158,000 DWT | Hyundai Samho HI | Evalend Shipping Co. S.A. | 2025 - 05 | 2023 - 04 |
Tanker, 158,000 DWT | Hyundai Samho HI | Evalend Shipping Co. S.A. | 2025 - 02 | 2023 - 04 |
Tanker, 157,000 DWT | New Times Shipbuilding | Capital Ship Management | 2025 - 12 | 2023 - 04 |
Tanker, 159,000 DWT | Shanghai Waigaoqiao | Frontline Management AS | 2026 | 2023 - 04 |
Records: 55, Page: 1 2 3
|