China Shipbuilding
  | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
Shipping
 Ship Building | Bulk Carrier |  Container Ship | Oil Tanker | Offshore & Support Vessel | Gas Carrier | Specialised & Others Vessel
 
 
 Yangfan Group
 Penglai Zhongbai Jinglu Shipyard
 Mawei Shipyard
 China Merchants HI, Jinling
 Yangzijiang Shipbuilding Group
 Huangpu-Wenchong Shipbuilding
 Taizhou Sanfu Shipyard
 Changhong Intl. Shipyard
 
 

1,400 TEU Container Feeder, LNG Fueled, Developed by Huangpu-Wenchong Shipyard

MAIN PARTICULARS

Length (o.a.) : 169.95 m
Length (b.p.) :  160.96 m
Bread moulded:   26.90 m
Depth moulded:   14.85 m
Design draught (Td): 8.50 m
Scantling draught (Ts):      9.60 m
Deadweight @ Ts:        19,500 ton

CONTAINER CAPACITY

On deck (6 tiers) :  844 TEU
In hold (5 tiers) :            536 TEU
Total: 1,380 TEU

MAIN ENGINE & SPEED

Main Engine: WIN GD 7RT-FLEX50DF T-III
Service Speed: 18.5 kn
Fuel Comsumption (Gas Model): 7,153 KJ/kWh

LNG FUELED

LNG Tank (Type C): 690 m3             
Endurance (LNG): 3200 nm
Endurance (HFO/MGO)  6500 nm

1,868 TEU Container Feeder, Bangkok type

  • Bangkok type
  • Hull form features S-BOW, optimized base on operation profile
  • Cargo holds for 3 tiers of 9’6” high cube + 2 tiers of 8’6”
  • Containerized dangerous goods of IMDG
  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : 171.95 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.30 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 9.50 m
Deadweight @ Ts:  23,750 ton

 

CONTAINER CAPACITY

In Hold / On Deck
626 / 1,286 TEU
Total
1,868 TEU
 Homogeneous 14t/TEU (T=9.75m) 1,290 TEU
Reefer plugs in hold / on deck: 50 / 180 FEU
Reefer (total): 230 FEU

MAIN ENGINE & SPEED

Main Engine: WinGD 6RT-flex58T-E Tier II, 1 set
Service Speed: 18.5 kn
Fuel Comsumption:     40.2 t/d

 EEDI Phase-III


1900 TEU Container Feeder, Gearless, Developed by Huangpu-Wenchong Shipyard

  • EEDI Phase-III Compliant



MAIN PARTICULARS

Length (o.a.) : abt. 172.00 m
Length (b.p.) :  168.70 m
Bread moulded:   27.50 m
Depth moulded:   14.60 m
Design draught (Td): 8.50 m
Scantling draught (Ts): 10.00 m
Deadweight @ Ts:  24400 ton

CLASS NOTATION

- DNVGL +1A Container Ship, COAT-PSPC(B), LCS, BIS, E0,BWM(T), Recyclable, Clean,TMON(oil lubricated), DG(P),

CONTAINER CAPACITY

On deck (7 tiers) 1,286 TEU
In hold (5 tiers)  644 TEU
Total   1,930 TEU
   
Reefer (on deck): 200 FEU
Reefer (in hold): 20 FEU
Reefer (total): 220 FEU

MAIN ENGINE & SPEED

Main Engine: MAN B&W 6S60ME-C10.5
Service Speed: 18.5 kn
Fuel Comsumption:     35.62 t/d

Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
1HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 102025 - 01
2HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 122025 - 01
3Dajin DJHC6092Container Ship, 1,208 teuUnknownJiangsu Dajin HI2026 - 122025 - 01
4Seatrade FranceContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2027 - 072025 - 01
5Seatrade SpainContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2027 - 092025 - 01
6Dajin DJHC6094Container Ship, 1,208 teuUnknownJiangsu Dajin HI2027 - 062025 - 01
7Dajin DJHC6096Container Ship, 1,208 teuUnknownJiangsu Dajin HI2027 - 102025 - 01
8Dajin DJHC6101Container Ship, 1,208 teuUnknownJiangsu Dajin HI2028 - 012025 - 01
9Jianxing JX1000TEU-5Container Ship, 1,058 teuNingbo Marine (宁波海运)Taizhou Jianxing HI2025 - 112024 - 11
10HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 082024 - 10
11HuanghaiContainer Ship, 1,760 teuSITCHuanghai Shipbuilding2027 - 072024 - 10
12Seatrade NederlandContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 102024 - 10
13Seatrade BelgieContainer Ship, 1,781 teuSeatrade Shipmanagement B.V.Huanghai Shipbuilding2025 - 102024 - 10
14Hyundai Mipo 4283Container Ship, 1,100 teuCadena Roro SAHyundai HI, Mipo2027 - 072024 - 09
15Hyundai Mipo 4284Container Ship, 1,100 teuCadena Roro SAHyundai HI, Mipo2027 - 082024 - 09
16Hyundai Mipo 4280Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 022024 - 09
17Hyundai Mipo 4279Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 012024 - 09
18Hyundai Mipo 4282Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 052024 - 09
19Hyundai Mipo 4281Container Ship, 1,100 teuCLdN Cobelfret SAHyundai HI, Mipo2027 - 042024 - 09
20Sanfu SF240311Container Ship, 500 teuUnknownTaizhou Sanfu Shipyard2026 - 072024 - 09
21Sanfu SF240311Container Ship, 500 teuUnknownTaizhou Sanfu Shipyard2026 - 092024 - 09
22Shengchang 12Container ShipWenzhou Shengchang Shipping CoChizhou Tianyu Shipbuilding2025 - 062024 - 09
23Shengchang 15Container ShipWenzhou Shengchang Shipping CoChizhou Tianyu Shipbuilding2025 - 062024 - 09
24Kyokuyo 589Container Ship, 1,096 teuUnknownKyokuyo Shipyard, Shimonoseki2026 - 082024 - 09
25Miura 1700Container Ship, 400 teuHamano Kaiun KKMiura Zosensho, Saiki2025 - 102024 - 07
Records: 136,   Page: 1  2  3  4  5  6  


 
  Re: Container Feeder (less 2,000 teu)
Dear

China Shipbuilding

I hope this email finds you well.

My name is Bapi Debnath, and I am a new investor in the shipping industry. I am writing to express my interest in manufacturing 1000 teu or more container vessels. I am confident that there is a strong demand for larger container ships, and I am looking for a manufacturer who can provide me with a quality product at a competitive price.

I would like to know more about your capabilities and experience in manufacturing container vessels. I am particularly interested in learning about your:

Manufacturing process
Quality control standards
Delivery time
Pricing

I would also like to discuss the terms and conditions of a potential contract. I am willing to make a significant investment in this project, and I am looking for a manufacturer who is committed to providing me with a quality product and a positive customer experience.

I would be grateful for the opportunity to meet with you to discuss this matter further. Please feel free to contact me at your earliest convenience.

Thank you for your time and consideration.

Sincerely,

Bapi debnath

Director/ Revat Venture Pvt. Ltd.
+91-6282148132
revat.pvt.ltd@gmail.com

Want to build this vessel? Please leave your message & contact detail here:
 
China Shipbuilding, 2014