25th of September, the first 23,000 TEU Dual-Fuel container ship luanching at Hudong-Zhonghua Shipyard. The vessel is designed by MARIC, construction at Hudong-Zhonghua Shipyard. The ship owner CMA-CGA order 9 units LNG fulled at CSSC group, 5 build by in Hudong-Zhonghua and 4 by Jiangnan Shipyard. The vessels with 18,600 cbm MARK-III LNG tanker which can support vessel double trip between China and European.
The vessel loa 400m, beam 61.3m, service speed 21.5knots, load 23,000 TEU container, power by WinGD dual-fuel main engine W12X92DF。
The first vessel shall be delivery at April of 2020.