 |
|
|
|
|
|
|
|
|
|
210,000dwt Newcastle Bulk Carrier -- Designed by Shanghai Waigaoqiao Shipbuilding (SWS)

- The Vessel to be a single screw ocean going Bulk Carrier having a deadweight of about 210,000 metric tons and to have topside tank, hopper and single side skin in way of cargo space, with forecastle, a stem, a transom stern and open water type of stern frame, a semi-balanced rudder and a fixed pitch propeller directly driven by a slow speed marine diesel engine.
- The vessel to be suitable for the transportation of coal and iron ore.
- All accommodations including navigation bridge and propulsion machinery to be located after.
- Double bottom to be extend between the fore peak bulkhead and the aft peak bulkhead.
- No.6 cargo hold may be used as water ballast tank (full or empty).
- Exhaust gas emission from the main engine and auxiliary engines shall comply with the IMO NOx Tier II limit as per Rule and with type approval certificate. To comply with IMO NOx Tier III limit, the NOx treatment system for main engine and auxiliary engines shall be applied.
- In SOX ECA control area, the Low Sulphur Heavy Fuel Oil (LS HFO) and MGO with viscosity minimum 3cSt shall be used.
MAIN PARTICULAR
Length (o.a.) |
299.88 m |
Length (p.p.) |
294.00 m |
Breadth, mld. |
50.00 m |
Depth, mld. |
25.20 m |
Design draught, mld. |
18.50 m |
Deadweight |
210,000 tons |
TANK CAPACITY
Cargo tanks: |
222,000 m3 |
Heavy fuel oil tanks: |
4,500 m3 |
MGO tanks: |
450 m3 |
Fresh water tanks: |
450 m3 |
Water ballast tanks: |
86,000 m3 (including No.6 cargo hold) |
MAIN ENGINE & SPEED
Main Engine: |
MAN 6G70ME-C10.5 with HP SCR |
Service speed: |
14.2 knots |
Fuel oil consumption: |
41.5 mt/day (Tier-III) |
Endurance: |
25,000 n.miles. |
210,000 DWT Newcastle Bulk Carrier (LNG Fuelled) -- Designed by Shanghai Waigaoqiao Shipbuilding (SWS)

- The Vessel to be a single screw ocean going Bulk Carrier having a deadweight of about 209,000 metric tons and to have topside tank, hopper and single side skin in way of cargo space, with forecastle, a stem, a transom stern and open water type of stern frame, a semi-balanced rudder and a fixed pitch propeller directly driven by a slow speed marine diesel engine.
- Two Independent IMO Type C LNG tanks to be located aft, just beside the accommodation and above the main deck.
- The vessel to be suitable for the transportation of coal and iron ore.
- All accommodations including navigation bridge and propulsion machinery to be located aft.
- Double bottom to be extend between the fore peak bulkhead and the aft peak bulkhead.
MAIN PARTICULAR
Length (o.a.) |
299.50 m |
Length (p.p.) |
294.00 m |
Breadth, mld. |
50.00 m |
Depth, mld. |
25.20 m |
Design draught, mld. |
18.40 m |
Deadweight |
209,000 tons |
TANK CAPACITY
Cargo tanks: |
220,000 m3 |
Oil tanks |
2,500 m3 (to be used without LNG full): |
Marine Gas oil tanks: |
450 m3 |
Fresh water tanks: |
450 m3 |
Water ballast tanks: |
90,000 m3 (including No.6 cargo hold) |
Type C LNG tanks: |
2 x 3,000 m3 |
MAIN ENGINE & SPEED
Main Engine: |
WIN GD W6X72DF |
Service speed: |
14.0 knots |
Fuel oil consumption (Diesel mode): |
49.4 MT |
Gas consumption (Gas mode): |
40.2 MT |
Endurance: |
Diesel: Abt. 13,000 n.m.
Gas: Abt. 17,000 n.m. |
|
Order Book
Vessel Type | Shipyard | Owner Company | Delivery | Contract Date |
Bulk Carrier, 64,000 DWT | Imabari Shipbuilding Saijo | Globus Shipmanagement Corp. | 2026 - 11 | 2023 - 08 |
Bulk Carrier, 64,000 DWT | Imabari Shipbuilding Saijo | Globus Shipmanagement Corp. | 2026 - 09 | 2023 - 08 |
Bulk Carrier, 82,600 DWT | Chengxi Shipyard | Cardiff Marine Inc. | 2026 | 2023 - 07 |
Bulk Carrier, 82,600 DWT | Chengxi Shipyard | Cardiff Marine Inc. | 2026 | 2023 - 07 |
Bulk Carrier, 82,600 DWT | Chengxi Shipyard | Agricore Ship Management (良禾航运) | 2026 | 2023 - 07 |
Bulk Carrier, 82,600 DWT | Chengxi Shipyard | Agricore Ship Management (良禾航运) | 2026 | 2023 - 07 |
Bulk Carrier, 180,000 DWT | Hengli HI | Unknown | 2025 - 08 | 2023 - 06 |
Bulk Carrier, 180,000 DWT | Hengli HI | Unknown | 2026 - 03 | 2023 - 06 |
Bulk Carrier, 180,000 DWT | Hengli HI | Unknown | 2026 - 06 | 2023 - 06 |
Bulk Carrier, 180,000 DWT | Hengli HI | Unknown | 2025 - 11 | 2023 - 06 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Cardiff Marine Inc. | 2026 - 01 | 2023 - 05 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2026 - 08 | 2023 - 05 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2026 - 10 | 2023 - 05 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Cardiff Marine Inc. | 2026 - 04 | 2023 - 05 |
Bulk Carrier, 184,000 DWT | Namura Shipbuilding | Unknown Japanese | 2025 - 06 | 2023 - 04 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Cardiff Marine Inc. | 2025 - 12 | 2023 - 03 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Cardiff Marine Inc. | 2025 - 10 | 2023 - 03 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Zhejiang Xiehai Shipping | 2025 - 01 | 2022 - 12 |
Bulk Carrier, 210,000 DWT | COSCO HI (Yangzhou) | Zhejiang Xiehai Shipping | 2025 - 01 | 2022 - 12 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2025 - 03 | 2022 - 11 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2025 - 06 | 2022 - 11 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2025 - 02 | 2022 - 11 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2025 - 04 | 2022 - 11 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2025 - 12 | 2022 - 11 |
Bulk Carrier, 210,000 DWT | Qingdao Beihai Shipbuilding | Bocimar International BV | 2026 - 03 | 2022 - 11 |
Records: 93, Page: 1 2 3 4
|