China Shipbuilding
  |    | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
 Newbuilding Report |  The first 23,000 TEU DF container ship launching
 
The first 23,000 TEU DF container ship launching
2019-09-24

25th of September, the first 23,000 TEU Dual-Fuel container ship luanching at Hudong-Zhonghua Shipyard. The vessel is designed by MARIC, construction at Hudong-Zhonghua Shipyard. The ship owner CMA-CGA order 9 units LNG fulled at CSSC group, 5 build by in Hudong-Zhonghua and 4 by Jiangnan Shipyard. The vessels with 18,600 cbm MARK-III LNG tanker which can support vessel double trip between China and European.



The vessel loa 400m, beam 61.3m, service speed 21.5knots, load 23,000 TEU container, power by WinGD dual-fuel main engine W12X92DF。

The first vessel shall be delivery at April of 2020.



 
Interesting this information? Please leave your message & contact detail here:

China Shipbuilding, 2014